Email Us

Production Process Of Stainless Steel welded Pipe:Professional Standard For Industrial Grade Fluid Transportation

Table of Content [Hide]


    industrial pipelinesindustrial pipelines


    In modern industrial pipelines,select the appropriate manufacturing process directly affects the sealing integrity and safety of the system.As one of the top ten pipe material brands in China.

    We use fully automatic continuous production line.Ensure that each stainless steel welding pipe meets the world-class standard.

     

    Stainless steel welded pipe:definition

     

    A pipe formed by continuously rolling steel strips and using the stainless steel welding process. 

     

    Key Difference:Unlike seamless pipes,the core quality of welded pipes lies in the stability of the welding technique and the subsequent heat treatment process.

     

    Welding Techniques:Industrial Grade Process vs Common Process.


     Industrial Grade ProcessCommon Process
    Main processPlasma welding+Argon arc weldingMIG welding technique
    SealingThe Weld seam coefficient is highThe weld seam coefficient is low and easy to produce air holes
    Heat effected zoneExtremely narrow and uniform,reducing stress concentrationWide ,easy to occur intergranular corrosion
    Degree of automationFully automatic continuous production lineSemi-automatic or manual operation


    Detailed explanation of core production process

     

    Step1:continuous molding and cleaning

    High-quality steel strips enter the machine and undergo multiple precision rolling processes.

    As a national standard drafting unit,we will carry strict surface cleaning before molding.

     

    Step2:Precision Welding

    This is the key to determining the quality.We use argon arc welding machines or lasers welding for on-site welding.Combined with plasma welding,ensure complete penetration of the weld root.

     

    Step3:Grinding the weld seam

    Precision equipment is used to roll the inner weld,eliminating residual height,smoothing the inner and outer walls ,preventing eddy corrosion of fluid in the heat affected zone.

     

    Step4:Solution Heat Treatment

    Solution heat treatment of stainless steel is essential step.

    The material is heated at 1050℃ in a protective environment and then rapidly cooled to restore its mechanical properties and corrosion resistance.

     

    Step5:Non-Destructive testing

    Each pipe must undergo eddy corrosive testing.

    Testing standard:strictly follow the stainless steel welding standards to ensure 100% defect-free delivery.


    non-destructive-testing.png


    FAQs


    Q:Why is the weld seam quality of welded pipes so important?

     

    A:Welding defects significantly reduce the safety factor of the system.As one of the top ten pipe material manufacturers in China,we have  controlled weld coefficient to 1.0,so that the strength of the welded pipe is equal to that of the base mental.

     

    Q:How to ensure that no batch quality issues occur in large-scale projects?

     

    A:The key lies in stability of the fully automated continuous production line.Our fully digital monitoring system ensures that every parameter of the welding techniques can be traced.


    Contact us to get more TDS

    FJGX

    Leading Manufacturer of Stainless Steel Piping Solutions.

    References

    Articles About Stainless Steel Products

    Popular Guangxin PipeTech Pipings, Fittings and Flanges

    Address
    Factory:Lidun Industrial Park, Zhouning County, Ningde City, Fujian, China